ARAMA SONUÇLARI

Toplam 126 adet sonuçtan 20 tanesi görüntülenmektedir.

Arama









Yıllara göre arama

Özel Aralık Girişi

Electronic Procurement Systems and Building Information Modeling Integration in Construction Sector: A Case Study
5th International Project and Construction Management Conference (IPCMC 2018), Girne/KUZEY KIBRIS TÜRK CUMHURİYETİ, Vol. 1, No. 1, 16 Kasım 2018, s. 290-297
SARAÇ ÇIRACIOĞLU AYŞEN,YAMAN HAKAN
Hakan Yaman Tam metin bildiri
Construction Project Managers’ Motivators and Human Values
Journal of Construction Engineering and Management, Vol. 143, No. 4, Nisan 2017, s. 4016115, ISSN: 0733-9364
WANG DI,ARDITI DAVID,DAMCI ATİLLA
Atilla Damcı Özgün Makale
The Evaluation Of Turkish Contractors’xx Views After Mandatory Mediation In Turkish Construction Sector
6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 401-409
ARICI ÜSTÜNER YAPRAK,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Tam metin bildiri
Detailed Design Readings from Architectural Construction Drawings
1st International Graduate Research Symposium on the Built Environment, Ankara/TÜRKİYE, 15 Ekim 2010, s. 307-312
YAZICIOĞLU FATİH,ALTUN MEHMET CEM
The interplay between leadership and organizational culture in the Turkish construction sector
International Journal of Project Management, Vol. 31, No. 2, Şubat 2013, s. 228-238, ISSN: 02637863
ÖNEY YAZICI ELA,GİRİTLİ FATMA HEYECAN,ACAR EMRAH,ORAZ GÜLFER
Emrah Acar Özgün Makale
An Assesment Of Lean And Agile Principles In Building Life Cycle Phases
, 6th International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 1279-193
TAŞ ELÇİN FİLİZ,BUĞAN JİBİD,TÜRKYILMAZ AYNUR HÜRRİYET,BAYLAR KIZILKAYA ŞENNUR,BOZDEMİR SERCAN,AKACALI GÜL ZİBA,ERGİN ASLIHAN,AKIN FIRAT DOĞU,ŞİMŞEK EKİN
Elçin Filiz Taş Tam metin bildiri
Utilization Of DSM In Design Phase Of IPD Projects: A Case Study
6th.International Project and Construction Management e-Conference (e-IPCMC-2020), İstanbul/TÜRKİYE, Vol. 1, No. 1, 12 Kasım 2020, s. 495-504
ÇİLELİ ELİF,TAŞ ELÇİN FİLİZ
Elçin Filiz Taş Tam metin bildiri
Megaproject Management with Particular Reference to a Mass Rapid Transit Project in Turkey
5th International Project and Construction Management Conference, 16 Kasım 2018
ALPKÖKİN PELİN,TOPUZ KİREMİTÇİ SABAHAT,KİZİLTEPE UGUR,CANİTEZ FATİH
Pelin Alpkökin Tam metin bildiri
Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial project
Automation in construction, Vol. 15, No. 2, Mart 2006, s. 166-177
SONG J,HAAS CT,CALDAS C,ERGEN ESİN,AKİNCİ B
Esin Ergen Pehlevan Özgün Makale
State-of-the-art review on information requirements for facilities management
6th International Project and Construction Management Conference, İSTANBUL/TÜRKİYE, 12 Kasım 2020, s. 121-132
TEZEL ECEM,HARTY CHRIS,GİRİTLİ FATMA HEYECAN
Ecem Tezel Tam metin bildiri
Towards Green Campuses: Students’ Perceptions and Expectations
5th International Project and Construction Management Conference(IPCMC2018), 16 Kasım 2018, s. 859-866
TEZEL ECEM,UĞURAL MEHMET NURETTİN,GİRİTLİ FATMA HEYECAN
Ecem Tezel Tam metin bildiri
A Critical Review of Post-Occupancy Evaluation (POE) Tools
5th International Project and Construction Management Conference (IPCMC2018), 16 Kasım 2018
ARTAN DENİZ,ERGEN PEHLEVAN ESİN,DÖNMEZ DENİZ,TEKÇE IŞILAY
Esin Ergen Pehlevan Tam metin bildiri
BIM Adoption in Metro Projects: Challenges and LessonsLearned
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
KAZAZ BİLLUR,ALEMDAR A SİNAN,MURTEZA MUSTAFA,ERGEN PEHLEVAN ESİN
Esin Ergen Pehlevan Tam metin bildiri
Identification of Queries for Decision Making in BuildingOperation and Maintenance
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
ARTAN DENİZ,YILMAZ NEZİHA,ERGEN PEHLEVAN ESİN
Esin Ergen Pehlevan Tam metin bildiri
Integrating Facilities Management Data in Building InformationModelling
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
KULA BEHLÜL,GÜVEN IŞIN GÜRŞANS,ARTAN DENİZ,ERGEN PEHLEVAN ESİN
Esin Ergen Pehlevan Tam metin bildiri
Assessment of the Capabilities of Commercial Tools to Develop4D/5D Models
5th International Project and Construction Management Conference (IPCMC 2018), 16 Kasım 2018
YEŞİLYURT MUSTAFA,ERGEN PEHLEVAN ESİN
Esin Ergen Pehlevan Tam metin bildiri
Identification of Queries for Decision Making in Building Operation and Maintenance
IPCMC2018, 5th International Project and Construction Management Conference, 16 Kasım 2018
ARTAN DENİZ, YILMAZ NEZİHA, ERGEN PEHLEVAN ESİN
Civil engineers’ personal values/demographics linkage in project team building
Engineering, Construction and Architectural Management, Vol. 24, No. 6, Kasım 2017, s. 1337-1349, ISSN: 0969-9988
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL
Gül Polat Tatar Özgün Makale
Effect of organizational culture on delay in construction
International Journal of Project Management, Vol. 35, No. 2, Şubat 2017, s. 136-147, ISSN: 02637863
ARDITI DAVID,NAYAK SHRUTI,DAMCI ATİLLA
Atilla Damcı Özgün Makale
Civil engineers’ personal values/demographics linkage in project team building
Engineering, Construction and Architectural Management, Vol. 24, No. 6, Kasım 2017, s. 1337-1349, ISSN: 0969-9988
DAMCI ATİLLA,ARDİTİ DAVİD,POLAT TATAR GÜL
Atilla Damcı Özgün Makale

İLETİŞİM BİLGİLERİ

İstanbul Teknik Üniversitesi Rektörlüğü İTÜ Ayazağa Kampüsü Rektörlük Binası, Maslak-Sarıyer / İstanbul Tel: +90 212 285 3930